leftmidnight.blogg.se

Excel formulas for civil engineering
Excel formulas for civil engineering










  1. #Excel formulas for civil engineering how to
  2. #Excel formulas for civil engineering pdf
  3. #Excel formulas for civil engineering full
  4. #Excel formulas for civil engineering download

The volume of concrete required = 0.038 m3/square feet areaĮxample:-If Plan Area = 40 x 20 = 800 Sq.

#Excel formulas for civil engineering how to

How to Make BBS of Pile Cap in Excel | Bar Bending Schedule | Trapezoidal 3P Pile Cap in Urdu/Hindiįollowing are thumb rules in Civil Engineering, 1. Thumb Rule for Concrete Volume Thumb Rule of Civil Engineering or the thumb rule for construction helps you in finding out the solution using a simple mathematical formula and make smart decisions whenever needed. There is some Civil Engineering Basic Knowledgethat every civil engineer must know. They play a crucial role while taking quick decisions on site. Thumb Rules For Civil Engineering is essential for any civil engineer, Site engineer, or civil supervisor.

#Excel formulas for civil engineering pdf

Before reading this article you must learn about Civil Engineering Basic Knowledge Thumb Rules For Civil Site Engineer pdf They can be found in Civil Engineering pdfs and are based on past experiences and common practices, but it’s important to adapt them for specific requirements of each construction project. These thumb rules are widely used in Civil Site Engineering and are helpful to calculate Steel in RCC, Brick Calculation, Concrete Mix Design and Shuttering Work.

excel formulas for civil engineering

Thumb Rules for Civil Engineering Construction are quick formula used by Civil Engineers and Quantity Surveyors to estimate the quantities of materials, strength, and reinforcement needed for a construction project. If any formula of BBS is missing from this article please tell me in comments.Thumb Rules Formula for Civil Engineers & Quantity Surveyors | Thumb Rules for Civil Engineering If you find this post helpful, then help others by sharing it on social media.

#Excel formulas for civil engineering full

Thank you for the full reading of this article in “ The Civil Engineering” platform in English. OTHER POSTS: Load Calculation on Column, Beam, Wall & Slab Basic Rules for Design of Column | Thumb Rules for Column Design Basic Components of Road Structure and Method of Construction How to Create Road Alignment Coordinates Report XML XLS in AutoCAD Civil 3D Difference Between Flexible and Rigid Pavement | Types of Pavementįull article on Earthwork Excavation Calculation for Road Work | Road Construction Layers | Road Estimate in Excel | Quantity Estimation of Road Work | Earth Work Calculation in Excel | Earth Work | Earthwork Calculation Formula. Earth Work Calculation in Excel | Video Tutorial:

excel formulas for civil engineering

Intermediate Point of Road Cross Section:Ībstract of Quantities for Earthwork Calculation:Įarthwork of Road Embankment (Complete Table):

  • The boost in formation level equal to Interval/gradient slope equal to 100/200 m equal to 0.50 ft Example | Quantity Estimation of Road Work Given Data:Įarthwork Calculation for Road in Hilly Area | Fully in Cutting in Excel | Quantity Surveying.
  • Since the formation is in a upward gradient (+g) of 200:1, formation width is 22 ft as well as formation level at R.D.
  • Formation level at initial RD equal to FL equal to 575.
  • Upward gradient slope equal to +g equal to 200:1 equal to 200.
  • Depth in cutting / Filling equal to 4 equal to Formation level – NSL.
  • Side slope in filling equal to S2 equal to 2:1 equal to 2.
  • Side slope in cutting equal to S1 equal to 1:1 equal to 1.
  • excel formulas for civil engineering

  • Top width of road equal to B equal to 22 ft (will be similar in all over the embankment).
  • #Excel formulas for civil engineering download

    Note: Download File Link is Available in the Bottom of this Post (Scroll Down) Specified information: Natural surface levels at different RDs are specified underneath – compute quantity of earthwork for the road? Reduced Distance 0 (cutting) 100 (cutting) 200 (cutting) 212.50 RD of IMP 300 (filling) 400 (filling) 500 (filling) N.S.L. On the part of road upward gradient of 200:1 is suggested. Formation level at RD equal to 0 is 575.00m. Road formation width in plain region is 22 ft as well as side slope in cutting is 1:1 and in filling is 2:1. Earthwork Excavation Calculation | Road Estimate Partially in Cutting and Filling:Ĭalculate approximately of earthwork through mean area method in partially cutting as well as filling lengthwise regarding road embankment. At the time of handling with earth work in hilly area, the following three types of situations occur: Earthwork Calculation Formula Earthwork Conditions in Hilly Areas: In this video, you will learn the detailed process for measuring the earth work in hilly area. This construction article is presented by the renowned engineer Mr.

  • Loading, transportation and unloading of soil.
  • excel formulas for civil engineering

    Excavation of soil or shifting of the soil.












    Excel formulas for civil engineering